ISSN 1009-6248CN 61-1149/P Bimonthly

Supervisor:China Geological Survey

Sponsored by:XI'an Center of China Geological Survey
Geological Society of China

    • The Core Journals of China
    • The Key Magazine of China Technology
    • CSCD Included Journals
    • Scopus Included Journals
Advance Search
TANG Ya-ming, LI Jun, LI Rui-dong, et al. The Risk Assessment for Sanyanyu Debris Flow, Zhouqu[J]. Northwestern Geology, 2011, 44(3): 80-86.
Citation: TANG Ya-ming, LI Jun, LI Rui-dong, et al. The Risk Assessment for Sanyanyu Debris Flow, Zhouqu[J]. Northwestern Geology, 2011, 44(3): 80-86.

The Risk Assessment for Sanyanyu Debris Flow, Zhouqu

More Information
  • Received Date: May 08, 2011
  • Revised Date: May 19, 2011
  • Published Date: September 04, 2011
  • Before,the debris flow risk assessment only focuses on a specific time point's risk.Few study analyzed the assessment factors changes and the risk's variations as a result of time change(before or after the debris flow occurring).The paper took Zhouqu Sanyanyu debris flow as a study case,applied the single debris flow risk assessing model;utilized the data of reconnaissance,explorations,and count measures engineering designs;analyzed the risk assessment factors changes at different time points which are before "8.8" disasters,at present,and after count measurements;acquired the parameters of hazards and vulnerability separately;and calculated the risks at these three time points.Finally,discussed the risks assessment results and analyzed the detailed reasons for the risk's variations at different time points.
  • Related Articles

Catalog

    Article views (2524) PDF downloads (4064) Cited by()

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return