Citation: | ZENG Qing-ming, XUE Qiang, XU Ji-wei. Analysis on the Debris Flow Characteristics and Effectiveness of Prevention Projects in Huangyang Gully in Longchi Town of Dujiangyan City[J]. Northwestern Geology, 2014, 47(3): 192-199. |
崔鹏, 韦方强, 何思明, 等. 5.12汶川地震诱发的山地灾害及减灾措施 [J]. 山地学报, 2008, 26(3): 280-282.
|
Cui Peng, Wei Fangqiang, He Siming, et al. Mountain disasters induced by the earthquake of May 12 in Wenchuan and the disasters mitigation [J]. Journal of Mountain Science, 2008, 26(3): 280-282.
|
崔鹏, 庄建琦, 陈兴长, 等. 汶川地震区震后泥石流活动特征与防治对策 [J]. 四川大学学报(工程科学版), 2010, 42(5): 10-19.
|
Cui Peng, Zhuang Jianqi, Chen Xingchang, et al. Characteristics and countermeasures of debris flow in Wenchuan area after the earthquake [J]. Journal of Sichuan University(Engineering Science Edition), 2010, 42(5): 10-19.
|
唐川. 汶川地震区暴雨滑坡泥石流活动趋势预测 [J]. 山地学报, 2010, 28(3): 341-349.
|
Tang Chuan. Activity tendency prediction of rainfall induced landslides and debris flows in the Wenchuan earthquake areas [J]. Journal of Mountain Science, 2010, 28(3): 341-349.
|
余斌, 马煜, 张健楠, 等. 汶川地震后四川省都江堰市龙池镇群发泥石流灾害 [J]. 山地学报, 2011, 29(6): 738-746.
|
Yu Bin, Ma Yu, Zhang Jiannan, et al. The group debris flow hazards after the Wenchuan earthquake in Longchi, Dujiangyan, Sichuan province [J]. Journal of Mountain Science, 2011, 29(6): 738-746.
|
陈近中. 四川省“8.13”特大暴雨地质灾害都江堰市龙池镇黄央沟泥石流应急勘查报告 [R]. 成都: 四川省地质工程勘察院, 2010.
|
Chen Jinzhong. Emergency investigation report of Huangyang gully debris flow of “8.13” rainstorm geological disasters in Longchi town of Dujiangyan city, Sichuan Province [R]. Sichuan Institute of Geological Engineering Investigation, Chengdu,2010.
|
陈近中. 四川省“8.13”特大暴雨地质灾害都江堰市龙池镇黄央沟泥石流治理工程初步设计报告 [R]. 成都: 四川省地质工程勘察院, 2011.
|
Chen Jinzhong. Preliminary design report of Huangyang gully debris flow control engineering of “8.13” rainstorm geological disasters in Longchi town of Dujiangyan city, Sichuan Province [R]. Sichuan Institute of Geological Engineering Investigation, Chengdu,2011.
|
王根龙, 张茂省, 赵成, 等. 对三眼峪泥石流以往防治措施的反思 [J]. 西北地质, 2011, 44(3): 115-121.
|
Wang Genlong, Zhang Maosheng, Zhao Cheng, et al. Post-thinking of the former mitigation measures for the Sanyanyu debris flow [J]. Northwestern Geology, 2011, 44(3): 115-121.
|
胡绍友. 从勒古洛夺沟84. 7. 1泥石流探讨拦挡工程的合理运用 [J]. 铁道建筑, 1986, (03): 24-26.
|
Hu Shaoyou. Discussion on the rational use of debris flow interception engineering from 84.7.1 debris flow in Leguluoduo gully [J]. Railway Engineering, 1986, (03): 24-26.
|
吴强, 陈征宙, 刘裕华, 等. 格栅坝在泥石流防治中的应用—以汶川地震引发的烂泥沟泥石流治理为例 [J]. 防灾减灾工程学报, 2011, 31(3): 341-348.
|
Wu Qiang, Chen Zhengzhou, Liu Yuhua, et al. Application of grille-dam to prevention and control of debris flows: a case study on control of Lanni gully debris flow caused by Wenchuan earthquake [J]. Journal of Disaster Prevention and Mitigation Engineering, 2011, 31(3): 341-348.
|
张茂省, 黎志恒, 孙萍萍, 等. 舟曲三眼峪“8.8”特大泥石流灾害特征与风险减缓对策 [J]. 西北地质, 2011, 44(3): 10-20.
|
Zhang Maosheng, Li Zhiheng, Sun Pingping, et al. The Disaster Characteristics and Risk Mitigation Measures of “8.8” Debris Flow at Sanyanyu Gully, Zhouqu [J]. Northwestern Geology, 2011, 44(3): 10-20.
|
张惠惠, 余斌, 吴雨夫, 等. 椿芽树沟泥石流灾害特征及防治对策 [J]. 水电能源科学, 2011, 29(10): 71-75.
|
Zhang Huihui, Yu Bin, Wu Yufu, et al. Debris flow characteristics of Chunyashu gully and prevention countermeasures [J]. Water Resources and Power, 2011, 29(10): 71-75.
|
Wang Genlong. Lessons learned from protective measures associated with the 2010 Zhouqu debris flow disaster in China [J]. Nat Hazards, 2013, Doi 10. 1007/s11069-013-0772-1.
|