ISSN 1009-6248CN 61-1149/P 双月刊

主管单位:中国地质调查局

主办单位:中国地质调查局西安地质调查中心
中国地质学会

    • 中文核心期刊
    • CSCD收录期刊
    • 中国科技核心期刊
    • Scopus收录期刊
高级检索

北祁连山石居里富铜矿选矿性试验与研究

李长安, 宋忠宝, 赵东宏, 王伟, 刘德成

李长安, 宋忠宝, 赵东宏, 等. 北祁连山石居里富铜矿选矿性试验与研究[J]. 西北地质, 2005, 38(1): 78-82.
引用本文: 李长安, 宋忠宝, 赵东宏, 等. 北祁连山石居里富铜矿选矿性试验与研究[J]. 西北地质, 2005, 38(1): 78-82.
LI Chang'an, SONG Zhong-bao, ZHAO Dong-hong, et al. Milling experiment and research of Shijuli copper deposit in the North Qilian mountain[J]. Northwestern Geology, 2005, 38(1): 78-82.
Citation: LI Chang'an, SONG Zhong-bao, ZHAO Dong-hong, et al. Milling experiment and research of Shijuli copper deposit in the North Qilian mountain[J]. Northwestern Geology, 2005, 38(1): 78-82.

北祁连山石居里富铜矿选矿性试验与研究

Milling experiment and research of Shijuli copper deposit in the North Qilian mountain

  • 摘要: 石居里铜矿床矿石中主要矿石矿物由黄铜矿及黄铁矿等组成。铜含量一般为4%~20%,由于黄铜矿与黄铁矿复杂的嵌布关系,采用传统的老三样(丁黄药、石灰、2#油)浮选(一段磨矿,小于0.074mm占70%左右)精矿粉的铜品位仅达15.03%。造成了一定铜资源的浪费。通过对该类型铜矿石的矿物学组构及特征的研究,经多次试验后采用DY-1捕收剂及两段磨矿流程,即一段粗磨矿(小于200目即0.074mm占70%左右)丢尾,二段粗精矿再磨(小于325目即0.043mm占95%左右)后精选,使铜精矿Cu品位达20.73%,同时使硫回收率由51.26%上升到74.11%。
    Abstract: The major ore mineral in the Shijuli copper deposit is chalcopyrite,copperas stone and so on.The content of copper in the deposit is about 4%~20%.Because of the complicated incrustation of chalco-pyrites and copperas stone,the outcome of traditional floatation of copper mineral which only contain a stage of mineral milling less than 0.074 mm take about 70% (the raw material is the fourth yellow drug,calcareo usness and the No.2 oil) is unideal,And the content of copper in the powder out from the progress is only 15.03%,it waste much copper mineral.By the research of mineralogy of the copper mineral in this area and many experiments,the researchers discovered that use DY-1 to capture the copper,and int roduced two stages of mineral milling.In the first stage,they grinded the copper mineral cursorily to make 70% of the mineral powder to 0.074mm.In the second stage,they continue to grind the milled mineral powder of the first stage to make 95% of them to 0.043mm.After that they go on to pick out the copper aboratively.As a result,they can get essential copper which its contentr each to about 20.73% (copper),and the recycle rate of the copper is 86.97%.And the essential sulfur content from which is reach to about 45.19% (sulfur),the recycle rate of the sulfur is 74.11%.The result of the experiment can apply to the mill-run progress in other diggings.
  • 李文渊,杨合群,赵东宏,等.北祁连发现塞浦路斯型同矿床[J].矿床地质,2001.18(3).

    杨合群,李文渊,赵东宏,等.北祁连山石居里沟富铜矿床成矿特征[J].地质与勘查,2000.36(6):20-22.

    夏林圻,夏祖春,徐学义.北祁连山海相火山岩岩石化成因[M].北京:地质出版社,1998.

    蔡玲,孙长泉,孙长林,等.伴生金银综合回收[M].北京:冶金工业出版社,1999.

    R.鲍温和A.冈纳提拉卡著.张炳熺,李文达译.铜矿地质及铜的经济评价[M].地质出版社,1992.

    金宏东.矿物化学处理][M].北京:冶金工业出版社,1999.

    杨奉兰,钱桂华."七五"期间我国有色矿山伴生金银选矿技术进展[M].北京:冶金工业出版社,1993.

计量
  • 文章访问数:  2447
  • HTML全文浏览量:  0
  • PDF下载量:  3395
  • 被引次数: 0
出版历程
  • 收稿日期:  2004-06-27
  • 修回日期:  2004-12-12
  • 发布日期:  2005-03-04

目录

    /

    返回文章
    返回